Installation - Lithuania

The slideshow above is of the first Rosehill Rodded crossing to be installed in Lithuania for the state-owned Lithuanian Railway Authority.

On the day, installation started at 12.05pm when the first gauge panels were lifted into place, quickly followed by the remaining gauge and field panels, chain guards and end restraints. By 13.25pm, the whole crossing was installed. Shortly after, the road surface was re-instated and the crossing re-opened to public use.

Rosehill Rubber Crossing Systems